5 Room Resale Packages

Professional Work
  • Space planning
  • Theme and conjecture design with 3D drawings.
  • Project planning and supervision
  • HDB documentation submission
Demolition Works
  • Hacking of skirting where required
  • Hacking of floor finishes at kitchen and bathroom
  • Hacking of wall finish at kitchen and bathroom
  • Hacking of door and door frame of bathroom
  • Hacking of sanitary accessories of bathroom
  • Hacking of existing cabinet and wardrobe
  • Haulage service for uplifting of goods and disposal of debris
Living Room and Bedroom
  • Vinyl flooring at living room and dining area
  • Laminate flooring in all bedrooms
  • False ceiling at foyer area
  • L-Box light holder at living and dining area.
  • Design and fabricate 1 set of 6ft wardrobe up to ceiling height
Kitchen and bathroom
  • Top and bottom kitchen cabinet. Size: 20ft
  • 10ft solid surface / granite worktop with
  • Vinyl flooring for kitchen
  • Floor tiles in bathroom
  • Wall tiles up to ceiling height for kitchen
  • Wall tiles up to ceiling height for bathroom
  • Construct 50mmm height base for fridge and washing machine.
  • Construct 50mmm height base for cabinet
  • Waterproofing membrane at kitchen and bathroom
  • Door frames for bathroom
  • Supply and install bi-fold doors for bathroom
Plumbing and Electrical Works
  • Supply up to 13 units of lighting points
  • Supply and install up to 13 units of LED down lights
  • Supply and install switches and power point for whole unit.
  • Supply and install 1 ceiling fan in living room.
  • Supply and install 1 unit 3 split aircon
  • Provide labor for installing kitchen sink and tap (sink and tap not included)
  • Laying of washing machine drainage outlet (washing machine not included)
  • Provide labor for installing accessories in bathroom (accessories not included)
  • Provide labor for installing toilet bowl and sink
  • Replace of standard cold water pipes for whole unit.
  • Replace of electrical wiring of whole unit.
Miscellaneous
  • Supply and paint whole unit wall using NIPPON emulsion paint (Choice of up to 4 colors)
  • Supply and paint whole unit ceiling using NIPPON Matex.
  • Chemical washing for whole unit.
Professional Work
  • Space planning
  • Theme and conjecture design with 3D drawings.
  • Project planning and supervision
  • HDB documentation submission
Demolition Works
  • Hacking of floor finishes at living and dining room
  • Hacking of skirting at all bedroom (where necessary)
  • Hacking of floor finishes at kitchen and bathroom
  • Hacking of wall finish at kitchen and bathroom
  • Hacking of door and door frames of bathroom
  • Hacking of sanitary accessories in bathroom
  • Hacking of existing cabinet and wardrobe
  • Haulage service for uplifting of goods and disposal of debris
Living Room And Bedroom
  • Supply and lay homogeneous floor tiles with skirting for living room and dining area
  • Laminate / Vinyl  flooring in all bedrooms
  • False ceiling at foyer area
  • L-Box light holder at living and dining area.
  • 6ft wardrobe  up to ceiling height in master bedroom
  • Veneer swing doors for bedrooms
Kitchen and bathroom
  • Top and bottom kitchen cabinet. Size: 20ft
  • 10ft quartz surface worktop
  • Lay wall tiles in kitchen area up to ceiling height
  • Lay wall tiles in bathroom up to ceiling height
  • Supply and lay floor tiles for kitchen and bathroom
  • Construct 50mmm height base for fridge and washing machine.
  • Construct 50mmm height base for cabinet
  • Waterproofing membranes at kitchen and bathroom.
  • Door frames for bathroom
  • Supply and install bi-fold doors for bathroom
Plumbing and Electrical Works
  • Supply up to 13 lighting points
  • Supply and install up to 13pcs of LED down lights
  • Supply and install switches and power point for whole unit.
  • Supply and install 1 ceiling fan in living room.
  • Supply and install 1 unit 3 split aircon (FREE!!! Worth $3,500)
  • Supply and install 1 unit storage heater
  • Provide labor for installing kitchen sink and tap (sink and tap not included)
  • Laying of washing machine drainage outlet (washing machine not included)
  • Provide labor for installing accessories in bathroom (accessories not included)
  • Replace of standard cold water pipes for whole unit.
  • Replace of electrical wiring of whole unit.
Miscellaneous
  • Supply and paint whole unit wall using NIPPON emulsion paint (Choice of up to 4 colors)
  • Supply and paint whole unit ceiling using NIPPON Matex.
  • Chemical washing for whole unit.
Professional Work
  • Space planning
  • Theme and conjecture design with 3D drawings.
  • Project planning and supervision
  • HDB documentation submission
Demolition Works
  • Hacking of floor finishes at living and dining room
  • Hacking of skirting at all bedroom
  • Hacking of floor finishes at kitchen and bathroom
  • Hacking of wall finish at kitchen and bathroom
  • Hacking of door and door frames of bathroom
  • Hacking of sanitary accessories of bathroom
  • Hacking of existing cabinet and wardrobe
  • Haulage service for uplifting of goods and disposal of debris
Living Room And Bedroom
  • Supply and lay homogeneous floor tiles with skirting for living room and dining area
  • Solid wood floor / vinyl  flooring in all bedrooms
  • False ceiling at foyer area
  • Ceiling fan
  • L-Box light holder at living and dining area.
  • TV feature wall with cove light
  • Wall paper in 1 of the wall in each bedroom
  • Low TV console
  • Wooden veneer door for bedrooms’ door
Kitchen and bathroom
  • Top and bottom kitchen cabinet. Size: 20ft
    1. With ABS trimming
    2. Full extension runner
    3. Soft closing cabinet hinge
    4. Hang on wall design
  • 10ft quartz surface worktop
  • Lay wall tiles (2ft x 1ft) in kitchen area up to ceiling height
  • Lay wall tiles (2ftx 1ft) in bathroom up to ceiling height
  • Supply and lay floor tiles for kitchen and bathroom
  • Construct 50mmm height base for fridge and washing machine.
  • Construct 50mmm height base for cabinet
  • Glass door or bi-fold door separate between kitchen and living room (where applicable)
Plumbing and Electrical Works
  • Supply up to 10 lighting points
  • Supply and install up to 10pcs of LED down lights
  • Supply and install switches and power point for whole unit.
  • Supply and install 1 ceiling fan in living room.
  • Supply and install 1 unit 3 split aircon (FREE!!! Worth $3,500)
  • Supply and install 1 unit storage heater
  • Provide labor for installing kitchen sink and tap (sink and tap not included)
  • Laying of washing machine drainage outlet (washing machine not included)
  • Provide labor for installing accessories in bathroom (accessories not included)
  • Replace of standard cold water pipes for whole unit.
  • Replace of electrical wiring of whole unit.
Miscellaneous
  • Supply and paint whole unit wall using NIPPON emulsion paint (Choice of up to 4 colors)
  • Supply and paint whole unit ceiling using NIPPON Matex.
  • Chemical washing for whole unit.
 
×
WastApp Me now